Construction History

Mt. Scott Elementary School Addition - Happy Valley, OR - $2.67M - Add Classroom and Cafeteria. Anticipated Completion November 2017

Pilot Butte Middle School – 2017 Renovations, Bend, OR - $490K Renovation of 6 total restrooms in buildings B, C & D. Completed Sept 2017

The Dalles Civic Auditorium, The Dalles, OR  - $300K Removal of existing auditorium ceiling, structural modifications to ceiling as required, new drywall ceiling with texture and paint. Existing chandeliers to be re-installed with winches to raise and lower for lamp replacement. Completed July 2017

BLS Transportation – 2017 Renovations, Bend, OR  - $2.4M Construction of New Administration Building & the north, east & south parking areas; Demolition of the existing Administration Building; Construction of the west portion of the parking area; & Construction of new addition to the existing Maintenance building. Completion Expected October 2017

John day Dam Office Space Remodel, Rufus, OR - $868K remodel of the John Day Dam 8th floor conference room and convert to office space (~3,163 GSF). Completed May 2017

Central Oregon Interagency Dispatch Center, Redmond, OR - $2.65M new 1-story building located at Roberts Field consisting of approximately 7,044 SF of office and support areas area to be used by the USFS. The site work consists of 35 parking spaces with overflow parking, connections to existing utilities located on the site, a 100 foot antenna tower with ice bridge, and landscaping. Completed June 2017

North Shore Medical Building, White Salmon, WA - $126K Completed August 2016

Columbia Basin Care Facility, The Dalles, OR - $500K Complete landscape, irrigation, custom outdoor kitchen and shade structure installation. Completed December 2016

Huntington Lodge at Pronghorn Resort, Bend, OR -  This project is a new roughly 60,000 SF luxury hotel located at Pronghorn Resort located in Bend, OR. The structure is a 3 story wood framed building, half over crawl space and half over concrete SOG construction. The parts of the building that are crawl space are being built over an existing lava tube that had been improved to support the building load, the crawl space was created to unload the tube of the soils weight. The foundation of this building was probably the most technically challenging to construct due to the lava tube and the engineering requirements. The skin systems include stone veneer and two tone pre-finished hardi lap siding. The roofing consists of sheetmetal, TPO and asphalt shingles. The finishes will be high end in this hotel, which include full tile shower, tile flooring, high end cabinetry and countertops and the use of hardwoods throughout. The site will include extensive landscaping, unit pavers, sidewalks, parking lot and two spas. Estimated Completion February 2018

Apparatus Room Replacement, Cloverdale, Sisters, OR - $819K one story pre-engineered metal building with a storage mezzanine, approx. total 6,545 sq. ft. the interior mezzanine with associated spaces below and vestibule appendage of wood framed construction. Completed September 2016

Redmond Center for Early Learning (Hartman Middle School Conversion), Redmond, OR - $800K (CMGC) Renovation to the existing Middle School Building to house the Early Childhood Center Program and the development of all required on and off site improvements.  Completed August 2016

Lakeview Heights Remodel, Heppner, OR $45K Interior remodel consisting of electrical, doors and hardware, carpentry and millwork, painting and gypsum board, kitchen shutters and cabinets. Completed May 2016

The Dalles Wasco County Children’s Library, The Dalles, OR – $950K Approx. 2,290 square foot addition to existing approx. 12,500 square foot library building. Work consisting of demolition, aluminum storefront, thermoplastic membrane roofing, wood decking, T & G vertical cedar siding exterior, aluminum windows, interior finishes, mechanical, plumbing, fire protection and electrical. Completed June 2016

Canal Row Park, Bend, OR  - $614K project consists of installation and construction of shade and restroom structures, concrete, asphalt, unit paving and playground surfacing, site furnishings, playground and play areas, retaining wall, footbridge, stairs and rails, irrigation and landscape. Anticipated completion October 2016

Deschutes County Breezeway,  Bend, OR - $140K Project consists of the alteration of interior improvements of the first floor of the Deschutes County Courthouse and new breezeway connection between the Courthouse and Justice Building. Includes HVAC; Electrical Power and Lighting; Fire Suppression Sprinklers; Fire Alarm; Security System. Completed February 2016

Redmond Proficiency Academy, Redmond, OR - $4.2M Design and construction of brand new 24,000sf middle school building with extensive site work. Completed August 2016.

The Dalles Transportation Center, The Dalles, OR –  $2M project consists of the general construction services for the Dalles Transportation Center for the Mid-Columbia Council of Governments, including all site work, mechanical, plumbing, and electrical services. The scope includes a building consisting of approximately 3,400 total square feet of wood frame construction on one floor, and associated site work on 1.68 acres. Completed May 2016

Tum-A-Lum Lumber Company, Hood River, OR -  $811K project  consists of general interior demolition and renovation of the existing retail, storage and office areas to create approximately 10,600 square feet of retail, receiving, office and employee spaces and approximately 4,700 square feet of storage, including a mezzanine. Completed June 2016

Gilliam County Road Department Warehouse Replacement, Condon, OR – $540K Construction of new 5,060SF warehouse structure, including site work, foundations, pre-engineered metal building, metal fabrications, interior wood framing, flashing, insulation, fenestrations, paint, electrical, mechanical, plumbing (downspouts), and other associated work. Completed April 2016

Crook County High School Repair Package, Prineville, OR - $529,000 various improvements and repair of the existing High School building; including demolition and interior partition wall/door/relight assemblies, finishes, ADA ramp improvements, mechanical, electrical, life safety/emergency, and low voltage system improvements. Completed August 2015

South Gilliam Emergency Services Building, Condon, OR - $1.4 million Construction of new 9,425 SF Emergency Services Building, including site work, foundations, pre-engineered metal building, interior tenant improvement, electrical, mechanical, plumbing, landscaping and other associated work. Completed April 2016

High Desert ESD TI, Redmond, OR – $422,000 renovation tenant Improvement of approximately 8,885sf of an existing office building; including but not limited to selective demolition and interior partition wall/door/relight assemblies, finishes, unisex shower room, folding panel partition and associated structure, mechanical; and bidder design-build plumbing, electrical, life safety/emergency, low voltage, fire suppression and alarm demolition and new system installation. Completed August 2015

Lake Chinook Fire District Apparatus Bay, Culver, OR - $432,000 Addition of a 128’ x 56’, 7168sf Apparatus Bay. Lake Chinook Fire and Rescue District. Completed July 2015

Paulina Elementary School Remodel, Paulina, OR - $940,000 renovation of Elementary School. Crook County School District. Completed April 2015

Unger Building TI, Redmond, OR - $584K Interior demo and remodel of one-story, approximately 4,139 sf office building. Completed August 2015

Prineville Secure Storage, Prineville, OR - $4.3 million New 105,000 sf facility consisting of 12 separate building structures and extensive earthwork, onsite and offsite improvements on an 8 acre site. Completed July 2015

COCC Ochoco Hall Remodel, Bend, OR - $1.5 million Extensive renovation to Ochoco Hall on Central Oregon Community College Campus. Work includes structural upgrades to the facility. Work had to be completed while buildings were in operations which required extensive timing and coordination of construction activities with the owner. Completed May 2015

Crook County RV Park, Prineville, OR – $123,648 Rehabilitation project. Completed April 2015

Central Oregon Community College Room 232 Remodel, Bend, OR - $155,000 Remodel of classroom space in COCC Pioneer hall while occupied. Completed March 2015

Central Oregon Community College Pioneer Ponderosa ADA Restroom Remodel, Bend, OR - $289,000 Modernization and ADA upgrades to restrooms in Pioneer and Ponderosa buildings on Central Oregon Community College Campus. Work had to be completed while buildings were in operations which required extensive timing and coordination of construction activities with the owner. Completed January 2015

Bend-La Pine School District 2014 Capital Projects, Bend, OR - $6.3 million consists of extensive renovations and additions on four separate school campuses that had to be completed in four months. Includes the complete demolition and build of new track and field, three building additions, three new gym courts and extensive interior renovations throughout the existing buildings. Completed September 2014

Pilot Butte Middle School, Bend, OR - $17,825 remodel of existing cafeteria space. Completed August 2014 

Cottonwood Canyon Managers Residence, Cottonwood Canyon State Park, OR – $315,258 a 2700 SF wood framed structure with metal roofing and fully finished inside with site improvements. Zero change orders! State of Oregon Parks and Recreation Dept. Completed August 2014

Moro City Hall, Moro, OR – $307,000 new city hall for the City of Moro. Consisted of a wood framed structure and fully finished interior space with site improvements, including a parking lot. Completed August 2014

Mid-Columbia Center for Living TI, Hood River, OR - $360,000 renovation to second floor. Completed January 2014

Lava Ridge and La Pine Elementary Improvements, Bend and La Pine, OR – $30,000 Demolition and construction of new time out rooms on two existing campuses with very little time before school re-opened. Completed August 2013 

Bear Creek and Pine Ridge Modulars, Bend, OR - $258,766 relocation, structural foundation and build out of existing modulars to two different sites. Completed August 2013

Mt. Defiance Fruit Storage Facility (CM/GC), Odell, OR - $2.6 million new 20,000sf fruit storage facility with offices, loading dock, parking lots and truck scale. Cold storage facility was of concrete tilt up and steel joist construction. Office building is wood framed. Cold storage has 4 CA rooms and one cold storage room along with mechanical room. Completed August 2013

Pocket Fuel TI, Hood River, OR - $207,369 Halyard Building tenant improvement. Port of Hood River. Completed July 2013

Central Oregon Community College BEC Remodel, Bend, OR – Summer work improvements. Completed 2013

City of Condon Central Park Plaza, Condon, OR - $111,836 construction of new hardscape, water feature and benches for the new central park. Completed 2013

Gilliam County Library, Condon, OR - $513,000 complete remodel of existing structure into new library space.  Completed 2013

Buckingham Elementary School, Bend, OR - $126,000 ADA improvement to exterior and interior of existing school. Bend La-Pine School District. Completed 2012

Central Oregon Community College Boyle Hall Remodel, Bend, OR - $146,800 extensive renovation on a busy college campus. Completed 2012

Central Oregon Community College Chandler Hall, Bend, OR - $310,932. Summer work improvements. Completed 2012 

Kenwood Bathroom Remodel, Bend, OR - $207,698 Addition of restroom facilities, remodel and renovations to existing school, new floor coverings, canopy replacements, electrical upgrades.  Bend La-Pine School District. Completed 2011

Education Center and Remodel, Bend, OR - $262,279 Remodel and renovations to existing school, demolition, electrical, plumbing, interior finishes and telecommunications. Bend La-Pine School District. Completed 2011

La Pine Middle School Awning, La Pine, OR, - $78,639 Replacement of outdoor awning to existing building. Bend La-Pine School District. Completed 2011

Marina Office Building Renovations, Hood River, OR – $238,000 extensive renovations to existing Port of Hood River Building. Completed 2011