Griffin Construction Job History

Prineville Apartment Complex, Prineville, OR $16M New apartment complex on a greenfield site located in Prineville, OR. The complex consists of 12 separate buildings totaling approximately 148,401 SF, which house 135 units and site improvements including: pool, fencing, sidewalks, parking lots and landscaping. The pool, fire sprinkler, plumbing, mechanical, electrical and fire alarm are design-build scopes of work.

North Lake School District, Silver Lake, OR (CM/GC) Expansion of the existing building to add 3 new classrooms and a multipurpose gym, replacement of an existing pre-school modular classroom, and a new bus mechanics shop project.

 The Dalles Veterans’ Home, The Dalles, OR $2.8M  Remodel of a 151-bed Skilled Nursing Facility. The work includes, but is not limited to: Addition of two airlock entry spaces; Complete roof replacement; and Remodel of an existing courtyard.

Hood River County School District 2016 Bond Project Scope Package #3, Hood River, OR $4.8M CM/GC.

    Hood River Valley High School • Addition and renovation to support CTE program • Site improvements including perimeter fencing 

    Mid-Valley Elementary: • Seismic Update in alignment with design and State grant

    Hood River Middle School: • Construction of new office/entry area in existing west courtyard • Renovation of interior spaces vacated by office function 

    Cascade Locks Elementary: • Misc. site improvements •Building envelope repairs • Main entry security vestibule • Security • Roofing Repairs                           

Deschutes Labs, Prineville, OR $1.4M Remodel of existing pre-engineered building into a CBD extraction facility, demolition, wall faming and finishes, HVAC system, fire suppression system, electrical and lighting, plumbing and fire alarm system. Fall 2019 

The Dalles Civic Auditorium, The Dalles, Ongoing renovation of Historical Auditorium. Phase 3 underway.

Maupin Civic Center, Maupin, OR (CM/GC) $2.4M 6,000 square foot, fully new and fully accessible structure will contain a new Library, City Hall, Common Spaces and various site improvements.

Wyeast Laboratory Remodel, Parkdale, OR Ongoing T&M work 

Hood River County School District Westside and Parkdale ES Facility Upgrades, Hood River and Parkdale, OR $4.9M Summer 2019 

Grant Union HS Seismic, John Day, OR CM/GC, $1.3M Seismic Retrofit Summer 2019 

Greenwood ES and La Grande HS Seismic, La Grande OR, CM/GC, $2.7M Seismic Retrofit of Greenwood Elementary School and La Grande High School Gymnasium includes the rehabilitation to the existing lateral system components. Summer 2019

Pronghorn Clubhouse Event Room TI, Bend, OR, $537K Pronghorn clubhouse event room tenant improvement. Completion December 2018.

Columbia Veterinary Hospital, The Dalles, OR $1.95M 5,603SF facility will include three exam rooms, 1 comfort room, treatment/surgery areas, an equine treatment area, and various supporting spaces. Completed May 2019.

Deschutes County Fire Stations 302 and 306, Bend, OR, $7.8M Two Fire Stations: a 9,751 SF new Fire Station 306 at Pilot Butte and a 7,287 SF new Fire Station 302 in Tumalo plus related site work. Completion expected September 2019

Maupin Civic Center – Maupin, OR, CM/GC $2M New Civic Center, a 6,000 square foot single story structure. Completion expected August 2019

Mid-Columbia Center for Living, The Dalles, OR $6.4M New 22,571 sf, 2-story, Type 5-B construction, fully-sprinklered medical office building. Completion expected May 2019

Redmond Wilco TI, Redmond, OR $1.4M Partial demo and complete 43,391 SF renovation of an existing building to develop a new Wilco with a green house and load-out canopy.  Includes: site work, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, install garden center, fire suppression, and plumbing. Completed August 2018

Ignite Faith Church, Redmond, OR $56K Remodel.  Completed April 2018

COE / Alt ED Remodel, Hood River, OR $2.9M Remodel of two existing buildings on the District Office Campus. The Coe Building includes relocation of staircases from inside the building to new constructed exterior stair wells. Revised office layout and complete new finishes. New mechanical and plumbing using some existing units and ductwork. Design Build electrical and data. Existing District Server room to remain operational throughout construction. Alt Ed Building remodel includes interior layout revisions from office space to classrooms. All new finishes. New mechanical using some existing units and ductwork and new plumbing including restroom relocation. Design Build electrical and data. Minor onsite parking lot/sidewalk replacement, new district office sign and refresh of landscaping.

South Gilliam County Soil and Water Conservation District Building, Condon, OR $1.2M Single Story Wood Framed Office Building. 

Imbler High School Seismic, Imbler, OR CM/GC $1.2M Seismic retrofit includes the rehabilitation to the existing lateral system components in order to meet the requirements for Life Safety as outlined in ASCE 41-13. This will be accomplished by adding to or altering the existing structure and lateral load path to the building foundation. Completion expected Sept 2018

Baker School District Seismic, Baker City, OR CM/GC $2.3M Brooklyn Primary School and Baker High School Gymnasium: For both schools, the seismic retrofit includes the rehabilitation to the existing lateral system components in order to meet the requirements for Life Safety as outlined in ASCE 41-13. This will be accomplished by adding to or altering the existing structure and lateral load path to the building foundation. Completion expected Sept 2018

HRCSD Westside Softball Facility, Hood River, OR $542K Hood River County School District Westside Softball Facility Project consists of a 3,526 Square Foot batting cage facility with locker and restrooms. Construction consists of masonry block walls with pre-fabricated wood trusses and metal panel roofing. All interior walls are wood construction with MOO plywood finish. Completion expected April 2018 

Crook County Middle School Seismic Upgrade-2017- Prineville, OR $752K Project consisted of seismic improvements on the north wall and roof of the gyms and adjoining hallway. The project was located at 100 NE Knowledge Street, Prineville, Oregon. Forty-Nine (49) work days are allocated for substantial completion after Notice to Proceed. Completed August 2017

 Mt. Scott ES Addition Happy Valley, OR $2.7M, Classroom and Cafeteria Addition Completion expected January 2018

Pilot Butte MS – 2017 Renovations Bend, OR $490K Completed Sept 2017

The Dalles Civic Auditorium The Dalles, OR $300K Removal of existing auditorium ceiling, structural modifications to ceiling as required, new drywall ceiling with texture and paint. Existing chandeliers to be re-installed with winches to raise and lower for lamp replacement. Current Phase completed Fall 2017

 BLS Transportation – 2017 Renovations Bend, OR  $2.4M Construction of New Administration Building & the north, east & south parking areas; Demolition of the existing Administration Building; Construction of the west portion of the parking area; & Construction of new addition to the existing Maintenance building. Completion Expected January 2018

John Day Lock and Dam Rufus, OR - $900K remodel on 8th floor conference room and convert it to office spaces (estimated 3,163 GSF).  Completed May 2017 

Central Oregon Interagency Dispatch, Redmond, OR - $2.64M new 1-story building located at Roberts Field consisting of approximately 7,044 SF of office and support areas area to be used by the USFS. The site work consists of 35 parking spaces with overflow parking, connections to existing utilities located on the site, a 100 foot antenna tower with ice bridge, and landscaping. Completed April 2017

North Shore Medical building, White Salmon, WA $126K 

Columbia Basin Care Facility, The Dalles OR - $500K Complete landscape, irrigation, custom outdoor kitchen and shade structure installation.

Crook County High School Stadium Repairs, Prineville, OR - $102K Stadium repairs including removing bleachers and cut to fit wall, install steel columns as per design and straighten wall. Completed August 2016

Huntington Lodge at Pronghorn, Bend, OR - This project is a new roughly 60,000 SF luxury hotel located at Pronghorn Resort located in Bend, OR. The structure is a 3 story wood framed building, half over crawl space and half over concrete SOG construction. The parts of the building that are crawl space are being built over an existing lava tube that had been improved to support the building load, the crawl space was created to unload the tube of the soils weight. The foundation of this building was probably the most technically challenging to construct due to the lava tube and the engineering requirements. The skin systems include stone veneer and two tone pre-finished hardi lap siding. The roofing consists of sheetmetal, TPO and asphalt shingles. The finishes will be high end in this hotel, which include full tile shower, tile flooring, high end cabinetry and countertops and the use of hardwoods throughout. The site will include extensive landscaping, unit pavers, sidewalks, parking lot and two spas. Anticipated Completion Feb 2018                                                                                         

Apparatus Room Replacement, Cloverdale, Sisters, OR - $819K one story pre-engineered metal building with a storage mezzanine, approx. total 6,545 sq. ft. the interior mezzanine with associated spaces below and vestibule appendage of wood framed construction.

Redmond Center for Early Learning (Hartman Middle School Conversion), Redmond, OR - $800K (CMGC) Renovation to the existing Middle School Building to house the Early Childhood Center Program and the development of all required on and off site improvements.

Lakeview Heights Remodel, Heppner, OR $45K Interior remodel consisting of electrical, doors and hardware, carpentry and millwork, painting and gypsum board, kitchen shutters and cabinets.

The Dalles Wasco County Children’s Library, The Dalles, OR – $950K Approx. 2,290 square foot addition to existing approx. 12,500 square foot library building. Work consisting of demolition, aluminum storefront, thermoplastic membrane roofing, wood decking, T & G vertical cedar siding exterior, aluminum windows, interior finishes, mechanical, plumbing, fire protection and electrical. 

Canal Row Park, Bend, OR  - $614K project consists of installation and construction of shade and restroom structures, concrete, asphalt, unit paving and playground surfacing, site furnishings, playground and play areas, retaining wall, footbridge, stairs and rails, irrigation and landscape.

Deschutes County Breezeway,  Bend, OR - $140K Project consists of the alteration of interior improvements of the first floor of the Deschutes County Courthouse and new breezeway connection between the Courthouse and Justice Building. Includes HVAC; Electrical Power and Lighting; Fire Suppression Sprinklers; Fire Alarm; Security System. 

Redmond Proficiency Academy (Design Build), Redmond, OR - $4.2M Design and construction of brand new 24,000sf middle school building with extensive site work. 

The Dalles Transportation Center, The Dalles, OR –  $2M project consists of the general construction services for the Dalles Transportation Center for the Mid-Columbia Council of Governments, including all site work, mechanical, plumbing, and electrical services. The scope includes a building consisting of approximately 3,400 total square feet of wood frame construction on one floor, and associated site work on 1.68 acres.

Tum-A-Lum Lumber Company, Hood River, OR -  $811K project  consists of general interior demolition and renovation of the existing retail, storage and office areas to create approximately 10,600 square feet of retail, receiving, office and employee spaces and approximately 4,700 square feet of storage, including a mezzanine.

Gilliam County Road Department Warehouse Replacement, Condon, OR – $540K Construction of new 5,060SF warehouse structure, including site work, foundations, pre-engineered metal building, metal fabrications, interior wood framing, flashing, insulation, fenestrations, paint, electrical, mechanical, plumbing (downspouts), and other associated work.

Crook County High School Repair Package, Prineville, OR - $529,000 various improvements and repair of the existing High School building; including demolition and interior partition wall/door/relight assemblies, finishes, ADA ramp improvements, mechanical, electrical, life safety/emergency, and low voltage system improvements.

South Gilliam Emergency Services Building, Condon, OR - $1.4 million Construction of new 9,425 SF Emergency Services Building, including site work, foundations, pre-engineered metal building, interior tenant improvement, electrical, mechanical, plumbing, landscaping and other associated work. 

High Desert ESD TI, Redmond, OR – $422,000 renovation tenant Improvement of approximately 8,885sf of an existing office building; including but not limited to selective demolition and interior partition wall/door/relight assemblies, finishes, unisex shower room, folding panel partition and associated structure, mechanical; and bidder design-build plumbing, electrical, life safety/emergency, low voltage, fire suppression and alarm demolition and new system installation. 

Lake Chinook Fire District Apparatus Bay, Culver, OR - $432,000 Addition of a 128’ x 56’, 7168sf Apparatus Bay.

Paulina Elementary School Remodel, Paulina, OR - $940,000 renovation of Elementary School.

Unger Building TI, Redmond, OR - $584K Interior demo and remodel of one-story, approximately 4,139 sf office building.

 Prineville Secure Storage, Prineville, OR - $4.3 million New 105,000 sf facility consisting of 12 separate building structures and extensive earthwork, onsite and offsite improvements on an 8 acre site.

COCC Ochoco Hall Remodel, Bend, OR - $1.5 million Extensive renovation to Ochoco Hall on Central Oregon Community College Campus. Work includes structural upgrades to the facility. Work completed while buildings were in operations requiring extensive timing and coordination of construction activities with the owner.

Crook County RV Park, Prineville, OR – $123,648 Rehabilitation project.

 COCC Room 232 Remodel, Bend, OR - $155,000 Remodel of classroom space in COCC Pioneer hall while occupied.

 COCC Pioneer Ponderosa ADA Restroom Remodel, Bend, OR - $289,000 Modernization and ADA upgrades to restrooms in Pioneer and Ponderosa buildings on Central Oregon Community College Campus. Work completed while buildings were in operations which required extensive timing and coordination of construction activities with the owner.

 Bend-La Pine School District 2014 Capital Projects, Bend, OR - $6.3 million consists of extensive renovations and additions on four separate school campuses that had to be completed in four months. Includes the complete demolition and build of new track and field, three building additions, three new gym courts and extensive interior renovations throughout the existing buildings.

Pilot Butte Middle School, Bend, OR - $17,825 remodel of existing cafeteria space. 

Cottonwood Canyon Managers Residence, Cottonwood Canyon State Park, OR – $315,258 a 2700 SF wood framed structure with metal roofing and fully finished inside with site improvements. 

Moro City Hall, Moro OR – $307,000 new city hall for the City of Moro. Consisted of a wood framed structure and fully finished interior space with site improvements, including a parking lot. 

Mid-Columbia Center for Living TI, Hood River, OR - $360,000 renovation to second floor. 

Lava Ridge and La Pine Elementary Improvements, Bend and La Pine, OR – $30,000 Demolition and construction of new time out rooms on two existing campuses with very little time before school re-opened.

Bear Creek and Pine Ridge Modulars, Bend, OR - $258,766 relocation, structural foundation and build out of existing modulars to two different sites. 

Mt. Defiance Fruit Storage Facility (CM/GC), Odell, OR - $2.6 million new 20,000sf fruit storage facility with offices, loading dock, parking lots and truck scale. Cold storage facility was of concrete tilt up and steel joist construction. Office building is wood framed. Cold storage has 4 CA rooms and one cold storage room along with mechanical room.

Pocket Fuel TI, Hood River, OR - $207,369 Halyard Building tenant improvement. 

BEC Remodel, Bend, OR – Summer work improvements for Central Oregon Community College. 

City of Condon Central Park Plaza, Condon, OR - $111,836 construction of new hardscape, water feature and benches for the city of Condon new central park. 

Gilliam County Library, Condon, OR - $513,000 complete remodel of existing structure into new library space.  

Buckingham Elementary School, Bend, OR - $126,000 ADA improvement to exterior and interior of existing school.

COCC Boyle Hall Remodel, Bend, OR - $146,800 extensive renovation on a busy college campus.

 COCC Chandler Hall, Bend OR - $310,932. Summer work improvements for Central Oregon Community College.

 Kenwood Bathroom Remodel, Bend, OR - $207,698 Addition of restroom facilities, remodel and renovations to existing school, new floor coverings, canopy replacements, electrical upgrades. 

 Education Center and Remodel, Bend, OR - $262,279 Remodel and renovations to existing school, demolition, electrical, plumbing, interior finishes and telecommunications.

 La Pine Middle School Awning, La Pine, OR, - $78,639 Replacement of outdoor awning to existing building.

 Marina Office Building Renovations (Hood River, OR) – $238,000 extensive renovations to existing Port of Hood River Building.